Software Services
For Companies
Products
Build AI Agents
Security
Portfolio
Build With Us
Build With Us
Get Senior Engineers Straight To Your Inbox

Every month we send out our top new engineers in our network who are looking for work, be the first to get informed when top engineers become available

At Slashdev, we connect top-tier software engineers with innovative companies. Our network includes the most talented developers worldwide, carefully vetted to ensure exceptional quality and reliability.
Build With Us
CTO Playbook: 90-Day MVP to Prod-Grade on PostgreSQL/MySQL/

CTO Advisory Playbook: MVP to Production-Grade in 90 Days
For enterprise CTOs, 90 days is enough to validate market fit, harden architecture, and ship safely. This playbook prioritizes early proof, ruthless scoping, and disciplined engineering, with special attention to PostgreSQL and MySQL development, platform reliability, and team leverage across a global talent network.
Days 0-7: Architect the smallest system that can win
Codify the problem as user journeys and data boundaries. Pick a single revenue-critical slice. Define Service Level Objectives: p99 latency, error budgets, and recovery targets. Decide data gravity early: choose PostgreSQL for relational integrity, JSONB flexibility, and robust indexing; choose MySQL for predictable throughput, mature replication, and wide managed support. Commit to a data migration strategy from day one.
- Team shape: product lead, tech lead, full-stack, platform, QA in-the-loop.
- Decision doc: ADRs for database choice, tenancy, and API boundaries.
- Security by default: SSO, least privilege, secrets management, audit trails.
- Budget guardrails: cost baselines, autoscaling policies, capacity alerts.
Days 8-21: Build a vertical slice with production hygiene
Deliver one end-to-end flow: signup to first value. Instrument every step. Model data with forward-compatible migrations. For PostgreSQL and MySQL development, enforce strict schema versioning, idempotent scripts, and blue-green rollout of changes. Introduce read-write separation behind feature flags to unblock later scale without rework.

- Observability: structured logs, RED/USE metrics, trace percent sampling.
- Quality gates: contract tests for APIs, seed data for repeatable runs.
- Access patterns: N+1 checks, bounded pagination, backpressure controls.
Days 22-45: Harden the platform
Codify infrastructure as code, ephemeral environments per pull request, and CI/CD with canary deploys. Add SSO, MFA, role mapping, and automated dependency scanning. Bake in data protections: encryption at rest, TLS 1.2+, row-level security where applicable, and regional backups with point-in-time recovery.
- Database safety: strong typing, check constraints, generated columns.
- Ops guardrails: circuit breakers, rate limits, retries with jitter.
- Data lifecycle: CDC to analytics, GDPR deletes, retention policies.
Days 46-75: Prove scale and cost discipline
Run load tests against realistic datasets. For PostgreSQL, tune work_mem, effective_cache_size, autovacuum thresholds, and use pgbouncer for pooling. For MySQL, verify InnoDB buffer pool sizing, slow query logs, and read replicas. Normalize only where it helps; denormalize through materialized views or summary tables fed by jobs.

- Performance recipes: composite indexes, query plans pinned by hints only as last resort.
- Caching: Redis for idempotency keys, rate tokens, and hot reads.
- Resilience: bulkheads, queues, and sagas for multi-step workflows.
- FinOps: cost per transaction, per-tenant budgets, kill switches.
Days 76-90: Launch-readiness, not heroics
Rehearse failure. Perform game days for dependency outages, degraded latency, and corrupted messages. Establish runbooks, on-call rotations, and escalation matrices. Lock a change freeze window and execute a phased rollout. Validate disaster recovery with a timed restore into a clean environment and a full synthetic smoke test suite.

Offshore and nearshore development: scale velocity, not chaos
Use offshore and nearshore development to widen coverage and compress cycle time, but engineer the interface. Standardize RFC templates, ADRs, and code review checklists. Timebox discovery to 48 hours and require demoable artifacts. Embed platform stewards who own CI/CD and database practices across pods to ensure consistency.
- Working model: follow-the-sun handoffs, 30-minute overlap, shared dashboards.
- Quality control: Definition of Ready/Done, DORA targets, flaky-test zero tolerance.
- Knowledge base: architecture maps, runbooks, and shadowing for continuity.
- Partner smart: slashdev.io supplies vetted remote engineers and software agency expertise so you add capacity without slowing governance.
Reference KPIs for the 90-day journey
- Time to first value: under 14 days, with telemetry attached.
- Deployment frequency: daily to main behind flags; change failure rate below 10%.
- p99 API latency: under 400 ms at 2x expected launch load.
- Ops readiness: two successful DR restores and one game day per critical dependency.
Common pitfalls and how to escape them
- Overbuilding: slash scope weekly; keep the backlog ruthless and visible.
- Schema churn: use feature flags plus shadow writes before irreversible changes.
- Invisible ops work: tie every platform task to a product metric.
- Unowned risk: assign a single DR owner and publish RTO/RPO in Slack and docs.
Finally, document everything: schemas, runbooks, and decisions. Written context beats meetings, especially across time zones and partner boundaries and interfaces everywhere.
Ninety days is a constraint, not a compromise. If you lead with SLOs, design the database around real access patterns, and orchestrate offshore and nearshore development through clear interfaces, you will ship fast and sleep at night. Pair deep PostgreSQL and MySQL development discipline with a pragmatic product slice and use a global talent network only where standards exist. That is how scrappy becomes production-grade without roulette.
