Software Services
For Companies
Products
Build AI Agents
Security
Portfolio
Build With Us
Build With Us
Get Senior Engineers Straight To Your Inbox

Every month we send out our top new engineers in our network who are looking for work, be the first to get informed when top engineers become available

At Slashdev, we connect top-tier software engineers with innovative companies. Our network includes the most talented developers worldwide, carefully vetted to ensure exceptional quality and reliability.
Build With Us
CTO Playbook: Ship Production-Grade MVP in 90 Days/
CTO advisory playbook: MVP to production-grade in 90 days
Here’s a pragmatic, board-ready plan to take a funded MVP to production-grade in 90 days without burning the team or the budget. It assumes you’re orchestrating web, data, and ML workstreams while coordinating in-house and offshore development services. Use these checkpoints and artifacts to keep velocity high and risk low.
Day 0-15: Frame the problem and build the backbone
Decide what “production-grade” means: SLOs, compliance boundaries, data retention, and recovery objectives. Lock a lean target architecture and create fast decision trails.
- Write NFRs and a one-page product thesis; capture ADRs for every irreversible choice.
- Map domain boundaries (DDD), define event contracts, and choose API styles per context.
- Seed a mono-repo or well-defined poly-repo; enforce CI from day one with trunk-based flow.
- Provision baseline cloud via IaC; isolate prod from non-prod; set secrets, feature flags, and observability.
- Choose Next.js (or equivalent) and plan Incremental static regeneration implementation for marketing and catalog pages.
- If ML is in scope, agree on model evaluation and guardrails: metrics, datasets, thresholds, and fallback policies.
- Define staffing plan including offshore development services with time-zone overlap agreements.
Day 16-45: Ship an investor-grade MVP
Cut vertical slices that prove value, not scaffolding. Automate tests, guard the edge, and leave room for fast pivots.

- Instrument analytics and synthetic monitoring before launch; wire dashboards to product KPIs.
- Implement RBAC, rate limits, and audit trails; version public APIs from v0.
- Ship ISR-backed pages for SEO; use getStaticProps with revalidate and stale-while-revalidate headers.
- Stand up data pipelines with PII classification and tokenization; store keys in a managed KMS.
- Prepare baseline evaluation sets for ML; add offline tests and canary online checks in CI.
Day 46-75: Hardening to production-grade
This is the reliability sprint where you make promises you can keep.
- Load test with realistic traffic shapes; define SLOs, error budgets, and rollback criteria.
- Adopt DORA metrics; enforce trunk-based merges, small PRs, and automated deploy gates.
- Run STRIDE threat modeling; meet OWASP ASVS; rotate secrets and enable hardware-backed keys.
- Enable full-fidelity audit logging with retention policies mapped to regulation.
- Apply budgets and tags for FinOps; alert on unit economics like cost per active user.
- Scale with managed queues and caches; document runbooks and test incident response.
Augment capacity with offshore development services, but treat them as one team. Require four-hour overlap, a named architecture owner, paired design reviews, and a crisp Definition of Ready/Done. For vetted engineers and agency leadership, slashdev.io provides excellent remote engineers and software agency expertise to help founders and product leaders realize ideas without slipping on quality.

Day 76-90: Compliance, scale, and handover
Close governance gaps and make operations boring.

- Finalize SOC 2/SLA artifacts; add privacy notices, DPA, and data lineage maps.
- Codify on-call, RTO/RPO, runbooks, and incident channels; rehearse a failure Friday.
- Ship blue-green or canary deploys with feature flags and database backfill plans.
- Deliver training, architecture diagrams, and a risk register with owners and dates.
Incremental static regeneration implementation in practice
Use ISR for pages where content changes often but not per-request personalized. Choose revalidate windows per page type: news 60-120 seconds, pricing 5-10 minutes, docs hours. Warm popular paths after deploy; add ETags and surrogate-control to let the CDN coalesce churn. Hook webhooks from your CMS to purge on critical edits; prefer background regeneration over blocking. Measure TTFB, LCP, and error rates in RUM; if a page is hot, graduate it to edge-rendered.
Model evaluation and guardrails that survive reality
Start with golden datasets and business-aligned metrics: accuracy or AUC for classification, latency, cost per output, and safety scores. Run bias audits across protected classes; track hallucination, jailbreak, and toxicity rates. Implement pre-filtering (PII scrubbing), prompt hardening, output filters, and a circuit breaker that falls back to safer models. Keep a human-in-the-loop for high-risk actions; log inputs, outputs, and decisions for forensics. Use a model registry with versioned artifacts, automatic rollbacks, and A/B tests with holdouts.
Execution hygiene and reporting
Run weekly business reviews that tie delivery to revenue, risk, and reliability. Publish a release dashboard showing scope burn-up, DORA trends, SLO compliance, and unit economics. Define success unambiguously: activation-to-paid conversion, MTTR under an hour, and net revenue retention lifts.
Common pitfalls and how to dodge them
- Deferring NFRs; they cost 10x more when added after scale.
- Overbuilding auth; start with SSO and roles, not custom policy engines.
- Dark-launching without dogfooding; require internal usage before GA.
- Unmanaged offshore vendors; mandate architecture reviews, SLAs, and code ownership.
- Cutting eval sets “to save time”; your model debt becomes customer churn.
- Skipping post-launch ops; no on-call, no runbooks, no trust.
